Client: IBERDROLA
Location: México ()
Complete electromechanical assembly of 80 MW of the 220 MW Santiago solar power plant located in Villa de Pozo in the state of San Luis de Potosí in Mexico.
Client: Solaire Direct
Location: Caborca, Sonora (Mexico)
Design and construction of the 130 MW Abril solar photovoltaic plant in Sonora.
Client: OPDE
Location: Cádiz (Spain)
Design and construction of the 50 MW Miramundo solar photovoltaic plant, including the construction of the 30/132 kV transformer substation and the interconnection line.
Client: Solaire Direct
Location: Aguascalientes (Mexico)
Construction of the 158 MW Trompezón solar photovoltaic plant in Aguascalientes, Mexico.
Client: OPDE
Location: Zaragoza (Spain)
Design, engineering, management and site management, supply, assembly, construction and commissioning of the 49.96 MWp Los Belos Photovoltaic Plant (La Muela, Zaragoza) and 11.24 MWp El Muel (Muel, Zaragoza), including the infrastructures for the evacuation of electrical energy to the 95MVA 30/220kV Dalton transformer substation.
Client: AES
Location: San Fernando (Colombia)
Turnkey construction of the 20.4 MW Nueva Castilla solar photovoltaic plant owned by Ecopetrol.
Client: GUASCOR SOLAR ITALIA
Location: Italia (Italy)
Construction of the 6 MW Sabaudia solar photovoltaic power plant in Italy.
Client: CANADIAN SOLAR
Location: Aguascalientes (Mexico)
Design and construction of the 95 MWn Horus solar plant in Mexico.
Client: Solaire Direct
Location: Comondú, Baja California Sur (Mexico)
Design and construction of the 31 MW Sol de Insurgentes solar photovoltaic plant in Baja California, including the installation of a battery system and the substation and line for interconnection to the grid at 115 kV.
Client: AES
Location: El Salvador (El Salvador)
Turnkey construction of ten solar plants of 10 MWn each in El Salvador. The plants, located in different areas of the country, will be built in three phases, the first two of which are already under construction.
Client: W.E.B. ARUBA N.V
Location: Aruba (Aruba)
WEB Aruba, the company responsible for water and energy management in the state of Aruba, has awarded us the construction of the 5 MW Sunrise Solar Park, the island's first major solar power project.
Client: ENDE (GUARACACHI)
Location: Bolivia (Bolivia)
Turnkey construction of a 5 MW solar-diesel hybrid plant in Cobija (Bolivia) and its integration into the Cobija-Pando isolated electricity system through the installation of lithium-ion batteries in the substation bay (existing).
Client: EDP RENOVAVEIS, S.A.
Location: Rumanía (Romania)
Construction of the 9.4 MW Vanju Mare solar PV plant in Romania, including the underground medium-voltage line for connection to the existing substation.
Client: GENERACIÓN SOLAR SPA
Location: Región de Antofagasta (Chile)
Engineering, supply, construction, assembly, testing, commissioning and operation of circuit section 2 of 220kV HV line Cruceros - Laguna and its connection to María Elena Substation.
Client: ENGIE ENERGÍA S.A.
Location: Antofagasta (Chile)
Basic and detail engineering, supply, construction, assembly, testing and commissioning of all the works associated with the new 220kV switchyard for Capricornio substation, which will allow to section the 1x220kV Chacaya - Mantos Blancos line, connect the new 80MVA 220/110 kV transformation bay, connect the existing transformation bay, the expansion of the current 110kV main busbar, the incorporation of a new 110 kV switchyard transfer busbar, including all direct or indirect earthworks, civil works, perimeter closures, new control room, primary equipment, grounding mesh, auxiliary power supply equipment, protection equipment, remote protection, control, metering, communications, SCADA, etc., including upgrade of current equipment for its operation under the new physical and operational topology of Capricornio substation.
Client: SunEdison
Location: Chile (Chile)
Design, supply, construction and commissioning of an 80MVA 110/23kV transformer substation for the interconnection of the 70 MW Javiera solar photovoltaic plant.
Client: SunEdison
Location: Chile (Chile)
Design, supply, construction and commissioning of a 220/23 kV transformer substation for the interconnection of the 72 MW Crucero solar photovoltaic plant.
Client: SunEdison
Location: Chile (Chile)
Design, supply, construction and commissioning of two 220/23 kV, 2x50/65 MVA transformer substations and the 9 km 220 kV overhead line to connect the two substations.
Client: SunEdison
Location: Chile (Chile)
220 kV switchgear/elevator substation, located around 40 km north of Santiago, near the town of Colina, Metropolitan Region. It has 4 sections of double bus line plus transfer bus, plus coupling, transfer and trafo 1x130 MVA 220/22 KV. The substation interconnects to the SIC the PFV Quilapilun with an installed power of 110 MWp.
The project was awarded in March 2015, with construction work starting on 14 September of the same year.An average of 80 workers were employed for the construction work, with peaks of up to 110 workers.
Client: Solaire Direct
Location: Chile (Chile)
Construction of the 50 MW photovoltaic plant "Los Loros", comprising civil works and electrical installation, including the construction of the 110/23 kV Los Loros transformer substation and the overhead line between this substation and the transmission substation.